The Turkish Fire Code compliance period has ended — is your facility compliant?

The BYKHY compliance dates (31 December 2025; 31 May 2026 for accommodation facilities) have passed. Fire safety in existing buildings is now mandatory and subject to inspection. Let us assess which systems your facility requires together.

Legal compliance dates

31 December 2025

Expired

All existing buildings

Deadline for all existing buildings to remediate fire-safety equipment deficiencies.

BYKHY Provisional Article 4

31 May 2026

Expired

Accommodation facilities

Deadline for accommodation facilities flagged in inspection to obtain a fire-compliance report.

Workplace Permits Reg. Provisional Article 9

Note: This page is informational and does not constitute legal advice. A fire-engineering assessment is required for facility-specific compliance.

Which system is mandatory for which building?

Sprinkler (automatic)

Madde 96
  • Non-residential buildings: height above 30.50 m
  • Hotel/dorm: 100+ rooms or 200+ beds, or above 21.50 m
  • Indoor car park: above 600 m²
  • Mall / retail-entertainment: above 2,000 m²

Kitchen hood suppression

Madde 57
  • Kitchens serving more than 100 people at once
  • All commercial kitchens within a mall
  • Kitchens inside high-rise buildings (above 30.50 m)
  • Catering / meal factories

Gas (clean-agent) suppression

Madde 98
  • Switchgear / UPS / server and electronic rooms
  • IT rooms and data centers
  • Transformer and generator rooms
  • Museums, archives, libraries (TS ISO 14520)

Fire detection & alarm

Madde 75 / EK-7
  • All non-residential buildings over 4 storeys
  • Accommodation / healthcare: above 6.50 m and 1,000 m²
  • Industrial: above 21.50 m and 7,500 m²
  • 1 July 2025: mandatory in indoor car parks

Frequently asked questions

When is the Turkish Fire Code compliance deadline?+

For all existing buildings it is 31 December 2025 (BYKHY Provisional Article 4). For accommodation facilities flagged in inspection, a separate regulation sets 31 May 2026.

Is sprinkler mandatory for my hotel?+

Per Article 96, automatic sprinklers are mandatory for hotels, dorms and guesthouses with more than 100 rooms or 200 beds, or a building height above 21.50 m.

Does my kitchen need hood suppression?+

Under Article 57, automatic hood suppression is mandatory for kitchens serving more than 100 people at once, commercial kitchens in malls, kitchens in high-rises, and meal factories.

What is the difference between the two deadlines?+

31 December 2025 is the general BYKHY compliance date covering all buildings. 31 May 2026 applies only to accommodation facilities flagged in inspection, under a separate regulation — it is not a deadline for all buildings.

Is your facility compliant? Find out with a free site survey in Ankara